Zaozhuang Builds 191 Stations and 792 Piles Across Scenic and Highway Areas

State Grid Zaozhuang built 191 charging stations with 792 piles across core areas, scenic spots and highways, piloting green-power charging and a heavy-truck green channel before the holiday.

Section: Industry News By Dongshang Media & Communications

A supply pledge for the holiday

As cultural tourism meets green recharging over the National Day break, a city's network is tested not just by pile count but by layout density and maintenance detail. Zaozhuang offers a useful reference sample for smaller cities learning the craft of reliable public charging.

Coverage that reaches the edges

State Grid Zaozhuang placed stations sensibly around core districts, complexes, scenic areas, museums and highway corridors, reaching 191 stations and 792 piles that cover tourist hotspots and transit routes alike, so visitors are rarely far from a working charger.

Green power and heavy trucks

The utility upgraded high-power stations, piloted a green-car-charges-green-power model, and opened a green channel for heavy-truck charging applications, serving both residents and the steady electrification of freight that keeps shelves stocked.

Dongshang New Energy and Dongdian Huichong note that scene-first coverage, backed by 7x24 inspection, matters more than piling points. Public fast charging plus community slow charging forms a truly convenient net, and pre-holiday checkups that take stations offline to clean modules and test grounding are what keep built chargers reliably usable for residents and guests.

Prefer Chinese? View the Chinese version of this page →