Fushan District: Community Charging Installation and Operation

Old-town retrofit and industrial-park fit-out in one district — two markets that need two different playbooks.

Fushan is unusual in Yantai: the old town runs on stock-housing retrofit while the industrial parks and newer zones run on greenfield fit-out. Judging a Fushan site with the wrong playbook is expensive — retrofit sites live or die on grid headroom and siting, park sites on the AC/DC mix and billing design. We run both disciplines and phase construction by what the transformer can actually carry.

Two markets, two playbooks

  • Old-town stock compounds — the binding constraints are grid headroom and parking geometry. Load measurement first; upgrade only if the data demands it. Charging locations usually come from idle corners and disused bicycle shelters.
  • Parks and new zones — better capacity, so the questions are mix and billing: how many AC, how many DC, how employees charge, what visitors pay.

Reusing idle shelters instead of building new

Many Fushan compounds have abandoned or half-abandoned bicycle shelters, store rooms and odd corners between blocks. Converting them costs roughly 40–60% of a new shelter build — the shell, roof and hardstanding already exist. Before converting we check three things: structural capacity (especially snow load), a usable power access point, and whether the location blocks evacuation. If any of the three fails, we recommend a new location rather than forcing the old one.

Park charging: mix and billing

Our default park mix is 70–80% 7kW AC chargers for employees parked through the shift and 20–30% DC fast charging for visitors and business vehicles; logistics vans and shuttle buses get a separately planned high-power zone. Billing runs on three account classes — employees (monthly package or discounted rate), visitors (scan per kWh) and fleet vehicles (independently metered) — so the park's internal cost accounting stays clean.

Construction, protection grades and platform

Standard jobs run 7–15 days in phases to keep parking usable; park work is scheduled around production, including holidays or nights where needed. Fushan sits in the main urban area, so our O&M crews reach sites within 24 hours, with 4-hour fault response from the 7×24 platform. Equipment is specified by location: IP54+ outdoors (IP55+ near the coast or in garages), 304 stainless or hot-dip galvanised with fluorocarbon coating, shelter eaves at 2.2 m or higher with a roof slope of at least 5%, ZR cable and fire-stopped penetrations underground, tray earthing at 4 ohms. After handover the platform does the daily work — remote metering and restart, per-device revenue, automatic work orders, monthly reconciliation exports. Without that layer, chargers quietly become furniture.

How we deliver in Fushan District

  1. Free survey — site walk-through, photos, clamp-meter load recording where capacity is tight, then a written proposal with a fixed price.
  2. Grid application — we prepare drawings and paperwork and deal with the power supply company, so the property does not chase forms.
  3. Construction — in-house crews, cable trays and distribution boxes done to specification, typical duration 7–15 days.
  4. Platform onboarding — every device registered on Dongdian Huichong: scan-to-charge, billing, remote control, revenue dashboards and automatic fault work orders.
  5. Operation and maintenance — 7×24 monitoring, 4-hour fault response, on-site attendance within 24 hours, local spare parts, quarterly inspection.

Four safety configurations we do not cut

ConfigurationWhat it doesWhy it matters
Independent RCD per port30 mA trip, under 0.1 sOne faulty port does not cut the whole station or other residents' charging
Overload cut-off with self-recoveryBreaks on abnormal current, restores automatically Ageing batteries and poor chargers can pull 500 W+; unmanaged heat is a main fire cause
Full-charge auto-stop plus 8-hour capStops on detected full charge, hard stop at 8 h Prevents overcharge swelling and endless floating
Power-off memoryRestores billing state after an outage Avoids disputes during the stormy season

Three ways to cooperate

ModelCash flow for the propertyRevenue share
We invest and operateZero cost; positive from month oneProperty receives 30–40% of service-fee revenue
Joint investmentOne-off contribution; payback typically 3–5 years Property share up to 50–60%
Property buys, we maintainLargest upfront spendAll revenue to the property; annual O&M fee

Whichever model you choose, the property gets a platform account and sees every session, hour and yuan of revenue in real time. Settlement is calculated on the platform, so reconciliation is a report, not an argument.

Reference price ranges

ScopeReference range (RMB)
10-port e-bike station incl. standard installation (cabling within 30 m, RCD box, signage) 12,000–22,000
20-port e-bike station incl. standard installation18,000–32,000
7kW AC charger, device1,500–3,500 per unit
7kW AC charger, installation1,000–2,500 per unit
60 m² charging shelter with 10 ports, fire kit, lighting and CCTV 35,000–55,000

These are public industry reference ranges, not a Dongshang quotation. Site conditions vary widely across Yantai; the binding figure is the fixed-price quotation issued after a free survey. We quote one price with no hidden additions.

Common questions

Can you convert our old bicycle shelter instead of building a new one?
Often yes, at roughly 40-60% of new-build cost. We check three things first: structural capacity including snow load, a usable power access point, and clear evacuation. If any fails we say so and quote a new location instead.
How should an industrial park split AC and DC chargers?
Typically 70-80% 7kW AC for employees parked all shift and 20-30% DC for visitors and business vehicles, with logistics or shuttle fleets in a separately planned high-power zone. Billing is split into employee, visitor and fleet account classes.
How long does a Fushan installation take?
Standard community projects run 7-15 days, phased so parking stays usable. Park work is scheduled around production shifts, including nights or holidays where necessary.