Yantai Charging Services Overview

Eight entries, one chain: survey, grid application, construction, platform operation and revenue sharing. Click the entry that matches where you are stuck right now.

Eight entries, one business

These are not eight separate business lines — they are eight views of the same job. Getting a charging project done always comes down to four questions: where does the power come from, who approves, who installs, and who looks after it afterwards. The entries below just start from different corners of that problem.

  • Community charging — survey, application, construction and operation for residential communities, one team end to end.
  • E-bike charging stations — independent RCD per port, full-charge auto-stop, the strictest safety tier.
  • Charging shelters — steel or membrane, fire equipment included; the compliance keystone.
  • EV chargers — 7kW AC for overnight, 60–120kW DC for public fast charging.
  • Property cooperation — zero-investment revenue share, joint investment, or self-procurement with our O&M.
  • Online tool centre — ROI, shelter cost and business model calculators you can run in 30 seconds.
  • Case studies — anonymised delivery records across seven project types.
  • FAQ — cost, policy, fire safety and revenue questions answered.

Run the numbers before the meeting

We put three calculators in the tool centre because most stalled projects die not on price but on an unquantified account: the owners' committee asks why so many ports, the property asks when it pays back, the investor asks who carries the risk. If any question has no number behind it, the meeting ends there.

  • Investment & payback calculator — ports, utilisation, tariff and service fee in; one-off investment, monthly net, and static payback out.
  • Shelter cost estimator — area, structure, foundation method and fire tier; cost split into six components so you can see where the money goes.
  • Cooperation model comparison — self-operate vs revenue share vs joint investment, side by side on outlay, annual net and return on capital.

Every result is a theoretical value under ideal assumptions — enough to judge direction, never a substitute for a site survey and a written quotation.

What each service direction solves

DirectionThe real problem it solves
Community chargingCapacity, approvals and long-term responsibility — not the hardware.
E-bike stationsThe most urgent, most accident-prone demand in a community; safety configuration is everything.
Charging sheltersFire-acceptance keystone; the spread between quotes usually hides in foundations and fire provisions.
EV chargersMatch the charger to dwell time and capacity, not to budget vanity.
Property cooperationWho pays, who runs, who earns — written clearly enough to survive five years.

Find your role

You areFigure out firstStart from
Property managerWho funds, who maintains, who is liableProperty cooperationmodel comparison
Owners' committeeVoting, electricity settlement, who owns revenueFAQpayback calculator
Park / office logisticsCapacity headroom, AC/DC splitEV chargersE-bike stations
Private investorPayback, sharing base, O&M costPayback calculatormodel comparison
Already building, need a reliable crewQualifications, fire acceptance, response timeSheltersCase studies

What do things cost?

Public industry reference ranges, not our quotation: a 10-port e-bike station with standard installation (within 30 m cabling, RCD box and signage) runs roughly RMB 12,000–22,000 in Yantai; a 20-port unit about RMB 18,000–32,000; a 7kW AC charger RMB 1,500–3,500 per device plus RMB 1,000–2,500 installation; a 60­­–120kW DC charger RMB 30,000–60,000 per device plus RMB 20,000–50,000 for installation and grid connection. Use these to sanity-check other quotes — then get a free survey and a fixed price from us.

Prefer Chinese? View the Chinese version of this page →