Key points in this article
Past simple validation
The question is no longer whether, but how to do it economically and stably. Constraints of cost, standards and coordination are real and must be acknowledged instead of buried under enthusiasm that ignores the ground.
Common misconceptions
One trap is treating all districts alike. Resource endowment, industry structure and usage habits reshape the path; copying blindly rarely fits Yantai's varied districts, where one size fits none of them very well in practice.
A patient local rhythm
Dongshang New Energy moves in stages and reviews at each end. Utilization and coordination efficiency, not installed scale, are the signals that matter when judging whether a plan is truly working for local people.
For residents, an operator with a local maintenance team gives more reliable later response when faults appear, and a written responsibility boundary keeps small disputes from souring the whole arrangement over time. Avoiding these misconceptions is what lets load aggregation fit Yantai's reality instead of colliding with it after launch and costing everyone time they cannot get back.