Key points in this article
A Different Route to V2G
A report described a field trial in which an electric vehicle sent power back through an ordinary AC charger and its on-board charger, at up to 7 kW. This matters because many private parking spaces already use 7 kW slow chargers.
Why the Charger Side Is the Bottleneck
National figures cited in the report show a very large charging base, but bidirectional chargers make up a tiny share. Earlier work focused on costly DC bidirectional units. The alternative route keeps the existing AC system and adapts communication protocols and workflows.
Value Lies in Numbers
A single 7 kW unit is modest; hundreds aggregated become meaningful capacity. The key questions are stable communication on the platform, metering accepted by all parties, and clear returns for vehicle owners. Planning goals depend on neighbourhood-scale aggregation.
Dongshang New Energy suggests starting with orderly charging in off-peak hours, then small pilots where capacity allows, with measured settlement data. Do not promise high discharge income early. Check battery warranty, line loading and safety records first.