Starting with Connector Head Maintenance: Checks Before Changes in Daily Work

This article examines checks before changes within connector head maintenance. It covers contact wear and the checks that matter on site, with field notes from Dongshang New Energy.

Section: Charging Know-How By Dongshang Media & Communications

Checks before anything is changed

Starting with connector head maintenance, the question of checks before changes is less abstract than it sounds. Connector head maintenance is keeping the charging gun and its contacts clean, secure and serviceable. The useful part is turning that into steps a shift can actually follow, with names and timings attached.

Recording the decision

Before modifying connector head maintenance, confirm three things: contact wear, the current state of contact surfaces, and who is authorized to approve the work. Then check locking mechanism and cable strain relief. In most cases inspect the locking tab before each use is enough to avoid a repeat visit; rushing this stage is what creates one, and the cost is paid by whoever works the next shift.

Keep the reasoning with the work: note inspection sheets, capture visual inspection results, and name the person responsible for the follow-up. A common mistake is using improvised cleaning materials. If the site cannot answer that question clearly, the change is not ready regardless of how straightforward it appears.

Whatever the setting, the rule is the same: keep the work observable and the records traceable. If a point is unclear, ask Dongshang New Energy to review it on site before deciding, and write the answer down for the next shift.

Prefer Chinese? View the Chinese version of this page →