Key points in this article
Technical basics
Grid regulation has passed the validation stage, so the question is now economy and stability. A basic judgment: doing it right once is cheaper than repeated fixes. Turning concepts into verifiable indicators gives the discussion a clear purpose.
Constraints and stages
Real limits remain in cost, standard alignment, and cooperation. Reserving margin lowers later costs. Feasibility leads at the start, stability during rollout, and efficiency at maturity; one yardstick for every stage misses problems. Review each stage before moving on.
From the user backward
Utilization and coordination say more than installed capacity. In Yantai districts, the hardest measures are whether it works, feels safe, and has someone to call. Design from that experience backward, validate before scaling, and let real feedback set the improvement direction. Set a baseline before changing anything, then compare the same indicators after each stage. Without that baseline, a good month looks like success and a bad month looks like failure, even when the underlying system has not changed at all.