Key points in this article
Role and baseline
A new power system is more than new equipment; it is a new way of coordinating energy. One basic judgment is to validate in small steps before promoting widely. A system view reveals where complexity can create failures, and early pilots expose the problems that a grand design tends to hide.
From cases to mechanisms
One long-term indicator is whether individual cases become repeatable mechanisms. A single success is not enough; consistent results come from a documented method. That method relies on records, reviews and a habit of turning each problem into a correction that the next project can reuse.
Handling problems in operation
Judge readiness by long-term operating data, utilization and coordination efficiency. Keep responsibilities in writing so that when something goes wrong, the response is immediate rather than debated. In Yantai's varied districts, adapt the design to local conditions and rehearse responses before they are needed.
Assign an owner to every alert and response step. When responsibility is written down, the reaction to a fault is immediate rather than delayed by discussion about who should act.