Key points in this article
Why Site Selection Comes First
Site selection is the costliest stage to correct in a charging project. Equipment and operators can be swapped, but a wrong location, power point, or fire clearance means rework costing tens of thousands. Location also drives safety and usage: piles near residents' daily routes are used far more than those in forgotten corners.
Five Hard Requirements
Keep piles away from evacuation passages and exits in independent fire compartments, a non-negotiable red line. Choose points near the power source to cut wiring, and confirm spare transformer capacity to avoid expensive upgrades. Ensure level ground and smooth drainage, since Yantai's rain and snowmelt dampen low spots. Never occupy fire lanes or climbing surfaces, and provide lighting and surveillance for night use.
Older Communities and Costly Lessons
Older communities are hardest: narrow gaps and tight parking leave only fringe spaces. Operators map usable areas first, then assess each point and coordinate with nearby households. The most common mistakes—low-lying flood-prone spots, positions too close to windows, and underestimated power distance—are all avoidable at the survey stage. That is exactly why a professional site-selection process matters.