Key points in this article
What zombie piles actually are
In charging, zombie-pile governance is no longer a one-off but a trend. Faulty or offline piles left unrepaired become 'piles that cannot be used'; many places now put availability into assessment, driving dynamic retirement and routine patrol.
Renewal backs the cleanup program
The Action Plan for Large-Scale Equipment Renewal in Key Energy Sectors targets retiring and renewing low-efficiency chargers at or below 50kW nationwide by end-2026, about 2.65 million units, paired with smart O&M for a durable upgrade.
The retrofit combo and responsibility
Across high-tech zone communities, the 'charging canopy plus shared ports' combo is the most cost-effective old-neighborhood retrofit. Write site ownership, power responsibility, patrol frequency, incident handling and fee settlement before building to avoid blame-shifting later.
The high-tech zone's guide shows that selection is governance: choosing sites and equipment with availability in mind prevents the zombie piles that otherwise drain public confidence and waste scarce space. Good siting spares the city wasted space.
More in Industry News
- Township charging supply in Laishan District: what on-site teams should watch and do next
- How Zhifu District approaches intercity fast charging checklist: lessons for careful, steady delivery
- Interoperability and routine inspection and the road to reliable rollout in Yantai districts, Yantai
- Getting safety supervision closed-loop right on site: practical notes from Yantai districts, Yantai